FACILITY 1 - THAILAND
 
Location: Facility 1 is located within 300m of a deep water port and has easy access for standard size trucks to enter the facility. Ideal to supply steel for Modulization Yard 1.
 

Labour
Classification Quantity
 Total    2,000
 Staff (management/administration)  20
 Foreman  40
 Permanent Workforce  460
 Non Permanent Workforce  1,500


 

Shop 1 Area
Facility Area (m2)  
 Total    63,500  
 Material Storage Area  500  
 Warehouse  500  
 Assembly Area  50,000  
 Steel Fabrication Facility  11,500  
 Blast and Painting  1,000  

 

Shop 2 Area

Facility Area (m2)  
 Total    68,500  
 Material Storage Area  1,200  
 Warehouse  500  
 Assembly Area  50,000  
 Steel Fabrication Facility  14,400  
 Blast and Painting  2,400  


 

Capabilities and Tonnage Output
Description Per Month (tonnes)
Total    6,650
 Structural Steel  2,650
 Storage Tank  1,000
 Pipe Spools  2,000 (136,000DI)
 Heater and Reformer (incl castable)  
 Low Pressure Vesel, Duct, Chute, Hopper etc  1,000
 (Based on single activity of fabrication)  
Approved AMSE Stamp Certifications